Shelving - Freestanding

× 1

_images/image_26.png

Materials

  • 2x T Slot Upright Freestanding

  • 2x Tie Bar 600mm

  • 8x M12 Nuts and Bolts

  • 4x adjustable feet with M8 thread

  • 4x Castor Wheels with M8 thread (alternative to adjustable feet)

  • 10x U Bracket

  • 5x Light Shelf

  • 1x Shelf without light

  • 20x Grow Bar

Tools

  • 12mm spanner

  • 14mm spanner

Method

  1. Make sure you have sufficient space to set up your shelving. Setting up the Shelf is more manageable with 2 people but can be done alone if necessary.

_images/image_27.png _images/image_28.png
  1. Connect adjustable feet or castor wheels to the bottom of the twin slot profiles.

  2. Connect the Twin Slot Profiles with Tie Bars and the required Nuts & Bolts. If you are alone, we recommend conducting step 2 on the ground.

  3. Tip the unit over and connect feet or castor wheels to the threaded holes in the bottom

  4. Set the unit up again.

_images/image_29.png
  1. Now, simply slot in the U Brackets, leaving 6 holes in between each bracket.

_images/image_30.png
  1. Put the light shelves on top of the U Brackets so they can slide to the front and back. The cables of the light shelf should come out towards the back left of the unit.

  2. Done